Mon-Sat, 9:30am - 6:30pm
The Government of India provides a direct cash subsidy into your bank account based on the solar system size you install. The scheme applies to residential connections (up to 10 kW) across all states.
| System Size | Central Cash Subsidy | Rate Applied | Status |
|---|---|---|---|
| 1 kW | ₹30,000 | ₹30,000/kW | Active |
| 2 kW | ₹60,000 | ₹30,000/kW × 2 kW | Active |
| 3 kW | ₹78,000 | ₹30,000/kW up to 2 kW + ₹18,000 for 3rd kW | Active |
| Above 3 kW | ₹78,000 |
₹60,000 + ₹18,000 (3rd kW) Capped — no extra beyond 3 kW |
Capped at 3 kW |
Amounts are credited directly to the homeowner's Aadhaar-linked bank account after DISCOM inspection and commissioning. Commercial connections are not eligible for PM Surya Ghar cash subsidy but may claim Accelerated Depreciation.
Visit pmsuryaghar.gov.in, register with your Aadhaar-linked mobile, select your state and DISCOM (PSPCL / HPSEBL / UT Electricity / JKPDCL), and enter your electricity consumer number. Vermson can do this on your behalf.
The local DISCOM reviews your connection load, sanctioned capacity and roof layout. Approval is typically issued within 7 working days. We follow up directly with the DISCOM office on your behalf.
Our engineers visit your site, measure roof space, assess shading, and finalise the optimal system size and panel layout. You receive a transparent, fixed-price proposal — panel brand, inverter make, kWp size and expected annual generation.
Our MNRE-empanelled installation team mounts panels, sets up the inverter, connects AC/DC wiring and installs the generation meter. Most residential installations complete in 1–3 working days with zero disruption to your household.
We raise the net-metering application, schedule the DISCOM engineer's commissioning visit, and get your bidirectional meter installed. This is the step most installers leave you to handle alone — we stay with you through it.
Once commissioned, we upload the commissioning certificate, net-meter photos and your bank details to the PM Surya Ghar portal and state agency portal simultaneously. The central ₹78,000 is credited to your account within 30 working days; state top-up follows within a further 15–30 days.
Vermson prepares and uploads all of the above on your behalf as part of the installation package. You only need to share the base documents with us once.
Avg subsidy filed per client
Subsidy claims processed
Claims approved rate
All paperwork by Vermson
Every common subsidy question answered. If yours isn't here, call us — we've processed 500+ claims and have seen every edge case.
Free site visit. Exact subsidy calculation. Every application filed — central and state — without you lifting a finger.