Partner With Us

Mon-Sat, 9:30am - 6:30pm

Net metering. We file. You earn credits.

End-to-end net-metering application support — DISCOM paperwork, bi-directional meter installation, technical feasibility and grid synchronisation, handled entirely by our team.

100% Paperwork Handled DISCOM filings done for you
All-DISCOM Coverage Pan-India experience
Bi-Directional Meter Two-way energy & billing
30–45 Day Approval Typical commissioning window
100%Paperwork handled
All DISCOMsPan-India coverage
30–45 daysTypical approval
Bi-directionalMeter installed

Why net metering is the heart of grid-tied solar

  • Export surplus power to the grid
  • Credit on next month’s DISCOM bill
  • Two-way bi-directional meter
  • Mandated under PM Surya Ghar
  • Available in every state DISCOM
  • We handle the entire application
Page in development

A detailed Net Metering guide is on the way.

We’re putting together an in-depth resource covering system design, pricing, subsidies, case studies and ROI — tailored to Indian conditions. Until then, our specialists are ready to share a custom proposal within 48 hours.

What this page will cover

  • Net-metering policy by state & DISCOM
  • Application checklist & forms
  • Bi-directional meter installation
  • Feasibility study & sanctioned-load check
  • Synchronisation & commissioning test
  • Annual settlement & banking rules

What you can do today

  • Request a tailored quotation
  • Book a free site survey
  • Talk to a solar specialist
  • Check subsidy eligibility
  • Get an ROI estimate
  • Compare financing options
Why Vermson

India-wide solar EPC built on quality, uptime and accountability.

Tier-1 equipment only

BIS-listed modules, IEC-certified inverters and ALMM-compliant gear — no rebranded panels, no compromised lifetime.

25-year performance SLA

Performance ratio guaranteed for a quarter century. Monitoring, AMC and breakdown response included from day one.

True turnkey delivery

Survey, design, DISCOM filing, civil, installation, commissioning and AMC — one accountable partner from start to finish.

Estimated project lead time varies with capacity and site readiness — most installations complete in 2–6 months including statutory clearances.

Net-metering enquiry

Share a few details and we’ll send a tailored proposal within 48 hours.

or call us directly 1800 889 0253
FAQ

Frequently asked questions

Quick answers to the most common questions. Have something specific in mind? Drop us a note and we’ll respond the same day.

We’re working on it now — usually within a few weeks of launch. Meanwhile, for serious enquiries our team can share the same information directly over a call or email.
Absolutely. Fill the form on the right or call us — we’ll send a tailored quotation within 48 hours once we understand your site, load profile and goals.
Yes — structural audit, DISCOM net-metering filing, CEIG / electrical inspector clearance and subsidy paperwork are all included. You only have to sign where legally required.
Modules carry a 25-year linear performance warranty, inverters a 10-year warranty (extendable), and workmanship is covered under our AMC — first year complimentary.

Let us handle the DISCOM paperwork.

Free site audit. Tailored proposal in 48 hours. No obligation.