Partner With Us

Mon-Sat, 9:30am - 6:30pm

BESS. Solar that works after sunset.

Lithium-ion battery storage that lets solar power flow day or night — for backup, time-shifting, demand-charge reduction and grid services. From 5 kWh residential to MWh utility-scale.

Use Solar After Sunset Time-shift daytime generation
<20 ms Backup UPS-grade outage switchover
Demand-Charge Cut Shave peak kVA for industries
6,000+ Cycles 25+ year battery lifetime
5 kWh – 5 MWhCapacity range
80%Usable depth-of-discharge
6,000+Lifetime cycles
<20 msBackup changeover

What BESS unlocks for solar systems

  • Use solar after sunset
  • Instant backup during outages
  • Demand-charge reduction for industries
  • Slash diesel-genset run-hours
  • Grid services & arbitrage revenue
  • True 24×7 energy independence
Page in development

A detailed Battery Energy Storage (BESS) guide is on the way.

We’re putting together an in-depth resource covering system design, pricing, subsidies, case studies and ROI — tailored to Indian conditions. Until then, our specialists are ready to share a custom proposal within 48 hours.

What this page will cover

  • Lithium chemistry comparison (LFP / NMC)
  • Sizing by load profile
  • Inverter / hybrid-inverter pairing
  • Cycle life vs warranty fine-print
  • Demand-charge case studies
  • Safety, BMS & fire suppression

What you can do today

  • Request a tailored quotation
  • Book a free site survey
  • Talk to a solar specialist
  • Check subsidy eligibility
  • Get an ROI estimate
  • Compare financing options
Why Vermson

India-wide solar EPC built on quality, uptime and accountability.

Tier-1 equipment only

BIS-listed modules, IEC-certified inverters and ALMM-compliant gear — no rebranded panels, no compromised lifetime.

25-year performance SLA

Performance ratio guaranteed for a quarter century. Monitoring, AMC and breakdown response included from day one.

True turnkey delivery

Survey, design, DISCOM filing, civil, installation, commissioning and AMC — one accountable partner from start to finish.

Estimated project lead time varies with capacity and site readiness — most installations complete in 2–6 months including statutory clearances.

BESS proposal

Share a few details and we’ll send a tailored proposal within 48 hours.

or call us directly 1800 889 0253
FAQ

Frequently asked questions

Quick answers to the most common questions. Have something specific in mind? Drop us a note and we’ll respond the same day.

We’re working on it now — usually within a few weeks of launch. Meanwhile, for serious enquiries our team can share the same information directly over a call or email.
Absolutely. Fill the form on the right or call us — we’ll send a tailored quotation within 48 hours once we understand your site, load profile and goals.
Yes — structural audit, DISCOM net-metering filing, CEIG / electrical inspector clearance and subsidy paperwork are all included. You only have to sign where legally required.
Modules carry a 25-year linear performance warranty, inverters a 10-year warranty (extendable), and workmanship is covered under our AMC — first year complimentary.

Make your solar work after sunset.

Free site audit. Tailored proposal in 48 hours. No obligation.