Captive & open-access solar. For when your rooftop isn't enough.

Generate solar at a remote site and wheel power to your factory, office or multiple plants via the grid. 1 MW – 50 MW captive and group-captive structures with locked-in tariffs 30–50% below DISCOM commercial rates.

Captive & open-access solar by Vermson Energy
1 – 50 MWCaptive plant range
30–50%Tariff vs DISCOM
26%Min. equity (captive)
25 yrsPerformance SLA

Built for high-consumption industrials & institutions

  • 1 MW+ manufacturers
  • Multi-plant industrials
  • Data centres
  • Hospital groups
  • Multi-campus universities
  • Round-the-clock consumers
Captive vs Group-Captive vs OA-PPA

Three structures. Same idea — cheaper, cleaner power than the grid.

Captive (you own)

You hold ≥26% equity & consume ≥51% of generation. Lowest cost, full depreciation benefit, no cross-subsidy surcharge.

Group-Captive

Multiple consumers jointly own the plant proportionally. Best for industry clusters or sister concerns sharing one large plant.

Open-Access PPA

Zero capex. We own the plant & sell you power via grid-wheeling at a locked tariff 25–35% below DISCOM. Off-balance-sheet.

What you actually get

Utility-scale solar — engineered for your offtake.

Included

  • Land identification & lease support
  • Tier-1 panels (Bifacial / TOPCon)
  • Utility-grade central inverters
  • Transmission tie-in & substation
  • SCADA + remote O&M
  • 25-year Performance Ratio SLA

Handled for you

  • SPV structuring & equity drafting
  • Open-access / wheeling agreements
  • Transmission & distribution licensee NoCs
  • CEIG / electrical inspector clearance
  • Banking & energy accounting setup
  • BRSR / ESG Scope 2 reporting
Why Vermson

Captive solar is half engineering, half paperwork. We do both.

SPV & legal structuring

We structure the captive SPV, equity holding and PPA so you stay compliant with the Electricity Rules and Captive Generation criteria.

Wheeling expertise

Open-access applications, transmission tie-ins, cross-state wheeling — we have a track record of getting them approved without re-filings.

Full lifecycle ownership

EPC + O&M + 25-year PR guarantee. We don't hand off operations after install — we own performance for the life of the plant.

30–50%

Tariff vs DISCOM

25 yrs

PPA tenure

25+ yrs

Solar EPC expertise

25 MW

Clean energy installed

Captive / Open Access discussion

Share your annual consumption & preferred structure — we'll send a feasibility note in 5 working days.

or call us directly 1800 889 0253
FAQ

Captive & open-access FAQs

Answers to the questions we hear most. Have a different one? Drop us a message and we'll write you back.

Under the Electricity Rules, a captive plant requires the consumer (or group of consumers) to hold ≥26% equity in the SPV and consume ≥51% of the generated power. Captive status exempts you from cross-subsidy surcharge and additional surcharge — biggest tariff benefit available.
Both. Intra-state wheeling is straightforward; inter-state wheeling needs additional approvals from CTUIL / RPC and a separate inter-state transmission application. We've executed both — typically inter-state takes 3–4 months longer to commission.
Captive: you own ≥26%, get full depreciation, lowest lifetime cost, but it's on your balance sheet. Open-access PPA: we own the plant, you buy power via grid-wheeling at a locked tariff — zero capex, off-balance-sheet, slightly higher per-unit cost. We model both for your CFO before you decide.
8–12 months end-to-end: 2–3 months for land + SPV + approvals, 4–6 months for civil & installation, 1–2 months for transmission tie-in & commissioning. We run land identification and regulatory filings in parallel with engineering to compress the timeline.

Lock in industrial-grade green power. 30–50% below the grid.

Free feasibility study. CAPEX, group-captive & OA-PPA modelled together. Lifecycle ownership.