Partner With Us

Mon-Sat, 9:30am - 6:30pm

Apartment solar. Cut your common-area bill by 80%.

Rooftop solar for apartment complexes and housing societies — designed to offset lift, pump, lighting and clubhouse loads. Single bill, shared savings, RWA-approved structures.

Big Shared Rooftop Maximum yield per society
Offsets Lifts & Pumps Common-area bill cut 60–80%
Zero Per-Flat Capex Society corpus or PPA models
Subsidy Eligible PM Surya Ghar + state schemes
60–80%Common-area bill cut
4–6 yrsSociety payback
₹0Per-flat capex
25 yrsSystem life

Why apartments are perfect candidates for solar

  • Big shared rooftop, big yield
  • Offsets lifts, pumps & lighting
  • RWA fund or zero-capex EPC models
  • Lower common-area maintenance charges
  • PM Surya Ghar & state subsidy eligible
  • Transparent metering for every flat
Page in development

A detailed Apartment Solar guide is on the way.

We’re putting together an in-depth resource covering system design, pricing, subsidies, case studies and ROI — tailored to Indian conditions. Until then, our specialists are ready to share a custom proposal within 48 hours.

What this page will cover

  • RWA approval & AGM resolution support
  • Common-area vs flat-wise metering
  • Funding models — corpus, loan, PPA
  • Net-metering for societies
  • Maintenance & AMC for RWAs
  • Case studies of 50+ flat societies

What you can do today

  • Request a tailored quotation
  • Book a free site survey
  • Talk to a solar specialist
  • Check subsidy eligibility
  • Get an ROI estimate
  • Compare financing options
Why Vermson

India-wide solar EPC built on quality, uptime and accountability.

Tier-1 equipment only

BIS-listed modules, IEC-certified inverters and ALMM-compliant gear — no rebranded panels, no compromised lifetime.

25-year performance SLA

Performance ratio guaranteed for a quarter century. Monitoring, AMC and breakdown response included from day one.

True turnkey delivery

Survey, design, DISCOM filing, civil, installation, commissioning and AMC — one accountable partner from start to finish.

Estimated project lead time varies with capacity and site readiness — most installations complete in 2–6 months including statutory clearances.

Apartment solar enquiry

Share a few details and we’ll send a tailored proposal within 48 hours.

or call us directly 1800 889 0253
FAQ

Frequently asked questions

Quick answers to the most common questions. Have something specific in mind? Drop us a note and we’ll respond the same day.

We’re working on it now — usually within a few weeks of launch. Meanwhile, for serious enquiries our team can share the same information directly over a call or email.
Absolutely. Fill the form on the right or call us — we’ll send a tailored quotation within 48 hours once we understand your site, load profile and goals.
Yes — structural audit, DISCOM net-metering filing, CEIG / electrical inspector clearance and subsidy paperwork are all included. You only have to sign where legally required.
Modules carry a 25-year linear performance warranty, inverters a 10-year warranty (extendable), and workmanship is covered under our AMC — first year complimentary.

Bring solar to your society. Cut every flat’s bill.

Free site audit. Tailored proposal in 48 hours. No obligation.