Partner With Us

Mon-Sat, 9:30am - 6:30pm

Group captive solar. Shared plant, individual savings.

Off-site solar plants jointly owned by multiple industrial consumers under the captive structure — power evacuated through open access, with 26% equity giving you captive status and full cross-subsidy relief.

Shared Plant Multiple buyers, one SPV
26% Equity Rule Unlocks captive consumer status
No Cross-Subsidy Bypass DISCOM surcharge
25-Year PPA Lock Tariff certainty for plant life
26%Equity for captive status
₹2–3/uEffective tariff
0DISCOM surcharge
25 yrsPPA term

Why group captive beats traditional power purchase

  • Multiple consumers, one solar plant
  • Bypass DISCOM cross-subsidy charge
  • Just 26% equity unlocks captive status
  • Lower capex per consumer
  • Verified green power for RE100 / ESG
  • Long-term tariff lock via PPA
Page in development

A detailed Group Captive Solar guide is on the way.

We’re putting together an in-depth resource covering system design, pricing, subsidies, case studies and ROI — tailored to Indian conditions. Until then, our specialists are ready to share a custom proposal within 48 hours.

What this page will cover

  • Captive structure & SPV setup
  • Equity contribution modelling
  • Open-access & wheeling charges
  • 26% rule compliance & audits
  • PPA structuring & tariff lock-in
  • Renewable energy certificates (RECs)

What you can do today

  • Request a tailored quotation
  • Book a free site survey
  • Talk to a solar specialist
  • Check subsidy eligibility
  • Get an ROI estimate
  • Compare financing options
Why Vermson

India-wide solar EPC built on quality, uptime and accountability.

Tier-1 equipment only

BIS-listed modules, IEC-certified inverters and ALMM-compliant gear — no rebranded panels, no compromised lifetime.

25-year performance SLA

Performance ratio guaranteed for a quarter century. Monitoring, AMC and breakdown response included from day one.

True turnkey delivery

Survey, design, DISCOM filing, civil, installation, commissioning and AMC — one accountable partner from start to finish.

Estimated project lead time varies with capacity and site readiness — most installations complete in 2–6 months including statutory clearances.

Group captive enquiry

Share a few details and we’ll send a tailored proposal within 48 hours.

or call us directly 1800 889 0253
FAQ

Frequently asked questions

Quick answers to the most common questions. Have something specific in mind? Drop us a note and we’ll respond the same day.

We’re working on it now — usually within a few weeks of launch. Meanwhile, for serious enquiries our team can share the same information directly over a call or email.
Absolutely. Fill the form on the right or call us — we’ll send a tailored quotation within 48 hours once we understand your site, load profile and goals.
Yes — structural audit, DISCOM net-metering filing, CEIG / electrical inspector clearance and subsidy paperwork are all included. You only have to sign where legally required.
Modules carry a 25-year linear performance warranty, inverters a 10-year warranty (extendable), and workmanship is covered under our AMC — first year complimentary.

Lock in cheaper power for 25 years.

Free site audit. Tailored proposal in 48 hours. No obligation.